Comprehensive annual inspection of a Boon Edam Tournex revolving door installed in the New York City metro area, performed by an AAADM-certified inspector. The inspection follows the ANSI/BHMA A156.27 standard and the AAADM annual-inspection protocol.
What’s included
- RPM measurement against A156.27 RPM limit for the door diameter
- Breakout-force test at all wings (egress and non-egress configurations)
- Full safety circuit verification: SRD, SRB, SCS, TRS, EBS, emergency stops
- Stationary and rotating error-monitor diagnostic
- Boon-O-Matic drive assembly inspection (bearings, chain, encoder signals)
- Sensor alignment and presence/activation testing
- Signage compliance check against current A156.27 requirements
- Written inspection report and AAADM-compliant documentation
Scheduled within 5 business days of order confirmation.
Pricing is per door. For buildings with multiple revolving doors, add the corresponding quantity to your cart at checkout. Multi-door discounts are available on larger orders — contact us for a quote before checkout.



Reviews
There are no reviews yet.